RIVA Motorsports    RIVA Performance Forums    RIVA Performance Forums  Hop To Forum Categories  Sea•Doo PWC Performance Forum    IMPORTANT UPDATE - Valve Train Upgrade Kit Installation
Go
New
Find
Notify
Tools
Reply
  
  Login/Join 
Administrator
Posted
We discovered an omission in Step # 24 for our Valve Train Upgrade Kit (part# RS19050-VTU) installation instructions. The additional step which must be performed is highlighted below.

24. Secure rocker arm shaft using supplied bolts. NOTE: Reference illustration# 13 for proper torque sequence. Torque at first to 7 ft•lbs / 10 N•m. Torque again to 14 ft•lbs / 20 N•m. Finish tightening by turning each bolt an additional 90-degrees. DO NOT APPLY THREAD LOCK.

If you have already installed our Valve Train Upgrade Kit and run your craft the additional 90-degree rotation must be done to each bolt. Allow engine to cool completely before doing so.

Our instructions online have been updated to reflect this correction. We apologize for any inconvenience caused.


RIVA CREW
Please post and ride responsibly!!!
 
Posts: 4180 | Location: Pompano Beach, FL - USA | Registered: August 28, 2003Reply With QuoteEdit or Delete MessageReport This Post
 Previous Topic | Next Topic powered by eve community  
 

RIVA Motorsports    RIVA Performance Forums    RIVA Performance Forums  Hop To Forum Categories  Sea•Doo PWC Performance Forum    IMPORTANT UPDATE - Valve Train Upgrade Kit Installation

© 2007 RIVA Motorsports